Skip to navigation Skip to content Skip to navigation Skip to content
Blog

Viewing Posts in "Engineering + Technology"

WC

We have decided to take the guesswork out of Windcube verification and now offer validation testing of customer units against our reference Lidar at any time. The testing can serve as an addition or alternative to on-site validation against a mast.

Read more

CroppedImage600400 symplus3

After careful consideration and planning, Renewable NRG Systems (RNRG) has decided to discontinue the manufacture and sale of the SymphoniePLUS3 Data Logger (effective July 1, 2017).

Read more

iStock 000022136935 Full

On February 27, Dwyer Haney, the Product Manager for Renewable NRG Systems’ (RNRG) Turbine Control Solutions line, participated in a panel at the AWEA Wind Project O&M and Safety Conference in San Diego, California.

Read more

DB CHINA 6

This October, Dave and Barry spent two weeks in China—a trip that brought them from Beijing to Nansan Island, Zhanjiang, Guangdong province and eventually to the Puding county, Anshun, Guizhou province in the country’s southwestern region. The purpose of the visit was two-fold: to install Hybrid XTs on two existing turbines in vastly differently environments, and to attend the 2016 China WindPower Conference.

Read more

sym

The SymphoniePRO® Data Logger brings with it significant feature upgrades to an unparalleled legacy of purpose-built renewable energy data loggers.

Read more

RH 2

RNRG’s own Principle Software Engineer, Rob Hale, was recently named an Executive Fellow of BTV Ignite—the Vermont arm of the US Ignite initiative, which aims to grow tech hubs around the country. In addition to his work at RNRG, Rob helped found the Vermont Code Camp and serves as the co-organizer of the Vermont Coders Connection as well as HackVT, the state’s annual hackathon.

Read more

IMG 4312

As the first frost looms, now is the perfect time to consider Hybrid XT Turbine Control Sensors to ensure that your turbines continue to run smoothly, despite the icy ravages of winter.

Read more

Goal Post Web

RNRG has developed a goalpost mounting solution tailored for power performance testing. When used with our 80m XHD TallTower and standard 2.4m Side Mount Booms, the solution achieves full IEC compliance.

Read more

lidar blog5

In the course of conversations with wind developers new to Lidar technology, a number of questions seem to come up regularly. Two very practical questions have to do with how WINDCUBE Lidars might affect overall wind resource assessment campaign duration and also whether frequent relocations of the device are warranted.

Read more

class 1 anemometer video thumb

How many technicians does it take to install an anemometer?

Read more